• A result-oriented professional over 18+ years of experience in Railway Signalling Industry in Designs, Vendor Management, Customer Co-ordination, Project Management combining comprehensive technical knowledge and management skills, allowing problems to be solved creatively but with a broad understanding of stakeholder needs and attention to detail that ensures robust solutions • IRSE Signalling Principle designer and Signalling Verifier • Member of IRSE (MIRSE) • Member of Singapore Standards committee
PROFESSIONAL COMMITMENTS
• Expert in Re-Signaling (brownfield) CBTC Projects and System Migration strategy Management • Proven ability to analyze complex strategic and tactical problems into component parts.
• Outstanding delivery focus and attention to detail ensuring robust delivery of multidisciplinary solutions meeting the needs of all stakeholders.
• Committed to Quality, Accuracy, Timeliness and Efficiency in delivering allocated tasks. • Managing and developing teams on CBTC systems
SKILLS • CBTC system • Project Management • Vendor and Sub-contractor selection and management • Customer co-ordination • Team management • Resource development, competency management system • Co-ordination management with systemwide contractors • Technical proposals • Budget forecasting • Management of Shutdown projects
• Oversee the conduct and approve the outcome of trade studies to evaluate design alternatives in order to provide advice to both the customer and internal technical teams. • Coach and mentor architectural and technical teams. • Lead collaborative discussion between internal teams, vendors and customers to clarify and define system requirements. • Consult with customers and their representatives in order to appropriately influence system architecture and design. • Ensure that the proposed architecture and design will meet the customer’s requirements • Approve the system architecture, and provide leadership and guidance to the architecture team • Through broad consultation, produce documentation in support of the project, to the satisfaction of the customer. • Review and evaluate company and third party documentation and products. • Liaise with customers on technical, architectural and procedural issues as required. • Other duties as directed by the Project Manager. • Ensuring the implementation of multi-project synergies in order to optimize cost of technical solutions. • Developing and implementing policies, standards and procedures for the engineering and technical work performed in the Program, in conjunction with the Systems Engineering Manager. • Review of safety documentation and leading HAZOP sessions. • Review of CBTC design documents and control tables.
• Working as Engineering Manager with responsible to provide hardware solutions for Wayside signalling interface design including hardware components selection. • Head of Department - HOD for all the engineering designs for NSEW Singapore project with existing Westinghouse rail system interface with CBTC Thales PMI moving block system, Changeover Cubicle comprises 54 stations and a route length of 94 km. • Migration strategy Manager for all the NSEWP projects • Ensure that technical and safety standarfd are maintained in all aspects of design within the allocated project • Responsible to confirm that all design work is controlled, implemented and undertaken in accordance with relevant instructions/standards. • Manage the team resources and work package with forecasting manpower requirement to management for all the design works • Assist and monitor with the planning and progress of works in relation to timeline and budget. • Trained Singapore SMRT maintenance and operations team on CBTC wayside signalling design principles. • Presented NSEW Re-signalling wayside interlocking design and changeover principles to IRSE Singapore and IRSE Malaysia sections. • Responsible to deliver Proof of Concept stations, North South Line, East west line and Tuas extension. • Worked as an interface point between Thales Canada, Thales France and LTA/SMRT Singapore for wayside interface signalling solution. • Provided conceptual design solution for the system changeover from existing legacy system to new CBTC system • Supporting to supplier and procurement team in addressing component selection for hardware BOQ • Managing the sub-contractors • Complete signalling solutions for Canberra station, TanahMerah extension and 4in1 depot including interface with other SWC's. • Managing Installation, Planning and Design teams including work package management • Head of Decommissioning for NSEW project • Supporting bid team with cost estimation, schedule risks, technical description, migration plan and BOQ. • CCRB member with safety case preparation support for NSEW&TWE projects
Design, manufacture, delivery to site installation, migration, testing and commissioning of the signalling system for North-South and East-West lines and Tuas Extension projects (NSEW/TWE) in Singapore
• Confirm that all design work is controlled, implemented and undertaken in accordance with relevant instructions/standards. • Manage, control and monitor design activities ensuring timescales, contractual requirements and quality are met. • Manage the Signalling Design Group’s input to projects to fully comply with all statutory and regulatory provisions, including those prescribed by statutory bodies. • Managing the sub-contractors. interface with other SWC's and customer
• Worked as a Project Engineer and design manager for Klang valley Mass Rapid Transit (KVMRT) with Bombardier Cityflo 650 automatic train control solutions for Sungai Buloh-Kajang line in Malaysia
• Lead designer - Produced conceptual COC principle design for NSEW Singapore project with existing Westinghouse rail system interface with CBTC Thales PMI moving block system with Changeover Cubicle comprises 53 stations and a route length of 94 km. • Responsible to deliver Proof of Concept stations design for Changi Airport, Changi Online, EXPO, Tanah Merah stations and Bishan Depot Test Track. • Worked as an interface point between Thales Canada, France and LTA/SMRT Singapore • Provided conceptual COC interface design for wayside signalling devices • Supporting to supplier and procurement team in addressing the technical issues for Signalling racks.
• Carry out Independent Design, Checking and Verification of Signalling Systems.
• Ensure that Technical and Safety Standards are maintained in all aspect of Design within the allocated project • Provide support and guidance to the Design Manager on all aspects of the allocated project.
• Assist in the forecasting of Manpower requirements for all design work to enable allocation of resources to be made.
• Assist and monitor with the planning and progress or works in relation to timeline and budget.
• Worked as a verifier (Independent checker) for Control table of the Siemens technologies used in New Delhi and Shivaji Stadium, IGI Airport Station & Dwaraka Sector 21 of Delhi Metro Rail Corporation (DMRC)
• Produced bookwiring Vol.2, SMCPLC design, Cut-in design, COC recovery design, Modification design and Record updated in Thales Seltrac moving block system for Northern line JNUP (Jubilee and Northern Line Upgrade Project)
Commencing as a trainee engineer reaching the post of Senior Design Engineer
(Team Leader) with responsibility for the management of a team of 15 staff, plus trainees.
• Worked as Design Engineer and Team leader for producing and verifying the Signalling interlocking design.
• Worked as Design Engineer on Scheme design project (Consisting of stages like data capture, DTG-R Simulation using Scheme Simulation tool) for Sub-section 15, Sub-Section 16 and Victoria line section of LUL for Westinghouse Rail Systems, UK.
• Phase-2: Standardization of Route lists for England & Wales on South East, LNW and Western region of Netowrk Rail of Babcock Rail